Sr. No. |
Name of Project |
Project Cost (Rs. Crore) |
Project Agency |
Project Year |
Brief description of project activities |
1 |
CONSULTANCY SERVICES FOR WIDENING TWO LANE WITH PAVED SHOULDER FROM KM 0.00 TO 24.00 OF NH-166E THE STATE OF KARNATAKA.(TIKOTA BIJJARGI KANAMADI MH BORDER SECTION) |
158.45 |
NH (PWD) Vijapur Division Karnataka -VM Matere Infrastrucre Pvt Ltd |
2024-Ongoing |
Complete detailed engineering for project in role of Design Director for the National Highway project including services for Survey, Investigation, Traffic engineering, detailed design (geometrics, pavement, hydraulics and structural) and all drawings including structures, etc complete and getting approved from Proof, Safety Consultants and Authority Engineer |
2 |
“CONSTRUCTION & DEVELOPMENT OF ROAD AND GHAT ON WESTERN BYPASS TO VAJEGAON BANDHARA (GODAVARI RIVERSIDE) KM 0/000 TO 6/000 ON LINK ROAD NO 03 SH 247 TQ. DIST NANDED (ACTUALCHAINAGE FROM4/300TO6/000)” |
94.8 |
PWD, Maharashtra - SHARDA Construction & Corporation Pvt. Ltd |
2024-Ongoing |
|
3 |
Construction of New bypass cement concrete road of two lane with earthen shoulders purna road to malegaon road to hingoli road SH-247 (Nanded city Northern Bypass) km 0/000 to 6/000 Tq. |
77.59 |
PWD, Maharashtra-SHARDA Construction & Corporation Pvt. Ltd |
2024-Ongoing |
|
4 |
“Construction of Cement Concrete Road with Land Acquisition from NH-752 I to Chondi Kurunda Malegaon Taroda Bk Road SH-435 From Km 23/600 to Km 37/800, Tq. Nanded Dist Nanded. (Taroda Malegaon Project)” |
106.78 |
PWD, Maharashtra-SHARDA Construction & Corporation Pvt. Ltd |
2024-Ongoing |
|
5 |
Construction of Cement Concrete Roads and Drains of D.P.Roads under Maharshtra Suvarna Jayanti Nagarotthan Mahabhiyan Yogana in Municipal Council, Omerga Area Tq. Omerga, District Osmanabad (16 Roads), in the state of Maharashtra. |
99.8 |
PWD, Maharashtra - Vikram Infratech Developers Pvt. Ltd |
2024-Ongoing |
|
6 |
“Construction of High-level Bridge across Asna River on Malegaon to Taroda Naka Road MDR-93 Near Pasadgaon village, at Km 10/00 Tq. & dist. Nanded (With Land Acquisition) [FORM – C].” |
23.32 |
PWD, Maharashtra - SHARDA Construction & Corporation Pvt. Ltd |
2024-2024 |
Complete detailed engineering for project in role of Design Director for the National Highway project including services for Survey, Investigation, Traffic engineering, detailed design (geometrics, pavement, hydraulics and structural) and all drawings including structures, etc complete and getting approved from Proof, Safety Consultants and Authority Engineer |
7 |
Construction of Major Bridge including construction of approach road & RCC gutter on Sina River at km 214.130 of Kalyan Ahmednagar Pathardi road NH-61 (Old NH-222) in the State of Maharashtra.strict in the State of Maharashtra on EPC Mode. |
23.42 |
PWD, Maharashtra - Motilal Dhoot Infrastructure Pvt. Ltd |
2023-Ongoing |
|
8 |
FOR Rehabilitation and Upgradation of Jamkhed To Sautada Section of NH 548D from design Ch: Km 195.375 to Ch: Km 208.774 to two lane with paved shoulder/Four Lane configuration with rigid Pavement in the state of Maharashtra on EPC mode |
133.27 |
PWD, Maharashtra-Dhaneshwar Construction Private Limited |
2023-24 |
|
9 |
Construction of Bypass to Mozari Town on NH-53 Taluka-Tiwasa,Dist-Amaravati (Existing Km-118/700 to 124/400) (Design Chainage-Km-0+000 to 6+100) in the state of Maharashtra on EPC mode |
104 |
NHAI- Drishti structural engineering private limited |
2022-23 |
|
10 |
Four –Laning form Km.0/000 (Panvel) to km 42.300 (Kasu) in the state of Maharashtra on EPC Mode |
160 |
NHAI- M.s JM Mhatre Infrastructure Pvt Ltd, Mumbai |
2022-23 |
|
11 |
EPC-17 Improvement of NIla junction – Brahmanwada –Amdura-Malkautha –Balegaon- Koregaon phata-Babli 3Phata-Bellure to Naigaon to state Border MDR-83 in Nanded Dist .1) Part of Nila junction to Mugat junction Km 0/0 to 14/815 ,2)Cahitanya Nagar Shiv Mandir to Asna Bridge junction Km0/00 to 3/515, 3) Brahmanwada Bypass km 0/00 to 1/590(Total Length 19.920) Dist .Nanded ,Maharashtra. |
180 |
PWD Maharashtra MoRTH Project - Shreeji Infratech Private Limited |
2022-23 |
|
12 |
EPC-18 Improvement of Nila Junction Brahmanwada-Amdura-Malkautha- BelegaonKaregaonPhata-Babli Phata- BellurtoNaigaon to State Border MDR-83 In NAnded Dist .1) Part of Mugat junction to Khujda junction Km 14/815 to 34/750,2) Aamdura Bypass Malkautha Bypass Km 0/00 to 1/975 (Total Length 25.835) |
235 |
PWD Maharashtra MoRTH Project - Nuovogen Buildtech Private Limited |
2022-23 |
Complete detailed engineering for project in role of Design Director for the National Highway project including services for Survey, Investigation, Traffic engineering, detailed design (geometrics, pavement, hydraulics and structural) and all drawings including structures, etc complete and getting approved from Proof, Safety Consultants and Authority Engineer |
13 |
EPC-19 Improvement of NIla junction – Brahmanwada –Amdura-Malkautha –Balegaon- Koregaon phata-Babli 3Phata-Bellure to Naigaon to state Border MDR-83 in Nanded Dist .1) Part of Khujda junction to Koregaon Phata Km 34/750 to60/400 (Total Length 25.650) Dist .Nanded, Maharashtra on EPC Mode |
245 |
PWD, Maharashtra - SHARDA Construction & Corporation Pvt. Ltd |
2022-23 |
|
14 |
Improvement to Sonala-Rodgi-Pangri-Loni (BK.)-Loni (Kh)-Bharsgaon-Yelegaon-Degaon-pimpalgaon(M)-Shelgaon(BK.)-Shelgaon(Kh.) Kamth road MDR-27 Km.10/00 to 14/600 (Part Barasgaon pati to Bhaurao Cooperative Sigar Factory) & Degaon-Jawala (Patak)-Jawala (Murar)- Niwagha to SH 261 Road MDR-23 Km.0/00 to 4/00 (Part NH-361 Bhaurao Cooperative Sigar Factory) (4.00KM) Tq. Ardhapur Dist.Nanded in the state of Maharashtra on Engineering, Procurement & construction (EPC) Mode |
54.15 |
PWD Maharashtra - Shree Kashi Vishwanath Infra Projects Private limited, Nanded |
2022-2023 |
|
15 |
Widening and up-gradation by concreting to 2 Lane with Paved Shoulder of Kalyan –Nirmal road in Km .11/700 to 15/200 of NH 61 in Thane District in the km.11/700 to 15/200 of NH-61 in Thane District in the state of Maharashtra |
50 |
NH PWD Maharashtra MoRTH Project - Caprigo Infrastructure Pvt Ltd |
2021-22 |
|
16 |
162.1Construction of CC Road & RCC Drain from (A) DIG office –Bhagat Singh Chowk Sh-247 Part km 0/000 to 1/630 and 162.2Construction of CC Road & RCC Drain from Bomb Detect & Defuse Squad office – Jivali Mahale Chowk (Mama Chowk)-Western Bypass SH-247Part Km 00/000 to 1/430 In nanded city (TAluka and District –Nanded) In the state of Maharashtra. |
64.57 |
PWD Maharashtra MoRTH Project |
2021-22 |
|
17 |
Improvements to Math Kudal-Shivdav-Kadgaon- Gargoti Road, SH-179, Km 55/000 to 94/000, Tal. Bhudargad, in Kolhapur District in the state of Maharashtra (Total Length – 39 Km) |
106 |
PWD Maharashtra - KRISHNAE INFRASTRUCTURE PRIVATE LIMITED |
2019-2020 |
Complete detailed engineering for project in role of Design Director for the National Highway project including services for Survey, Investigation, Traffic engineering, detailed design (geometrics, pavement, hydraulics and structural) and all drawings including structures, etc complete and getting approved from Proof, Safety Consultants and Authority Engineer |
18 |
Upgradation from Bamni to Navegaon Section of NH 353B Design Chainage – from km 242+150 to km 284+400 of Chandrapur- Ballarpur-Kothari-Gondpipri- Ashti Road to two lane with Paved Shoulders / four lane configuration in the state of Maharashtra on EPC mode. (Total length – 42.2 Km) |
164 |
NH PWD Maharashtra MoRTH Project - Balaji Infratech & Construction Pvt.Ltd |
2018-2019 |
|
19 |
Improvement to Khandwa, Bhendwal, Paturda, Ukli, Ner, Nandkhed, Kinkhed, Daryapur, Asegaon, Chandur, Bazar, SH 278 road in km 0/000 to 33/500 Taluka Jalgaon(J) & Sangrampur Dist. Buldhana. (Total Length – 33.50 Km) |
78 |
PWD Maharashtra - KRISHNAE INFRASTRUCTURE PRIVATE LIMITED |
2018-2019 |
|
20 |
Widening & strnghtning of existing highway section to two laning with paved shoulder of NH-848, which includes section from Km 16+000 to Km 34+000 Km to 57/000 & Km 62/000 to 65/600 (approximately 39.600 Km) in Nashik district in the state of Maharashtra on EPC Mode. |
37 |
NH- PWD Maharashtra- M/s Nikhil Construction Pvt LTd, Pune |
2018-2019 |
|
21 |
Rehabilitation and Up-gradation of Ahmedpur to Pimpla Junction from Existing Km 183+000 (Ahmedpur on SH 56) to Existing Km 127+885 (Pimpla junction on SH 56) (Design km 0+00 to km 55+623) of AhmedpurKinagaon-Ambejogai- Kaij- Manjarsumbha-Patoda-Jamkhed SH 56 road to Two lane with paved shoulders instate of Maharashtra. – (Total length 55.60 Km) |
300 |
MSRDC, MoRTH Project |
2017-2019 |
Detailed Topographic survey, Geotechnical investigation, soil testing, inventory survey and traffic surveys for the detailed design for NH Project |
22 |
Up-gradation of Section 55+937 Km to 114+486 Km of NH-75 2E from Shirur to Kharda in the state of Maharashtra on EPC Mode. – (Total length 58.5 Km) |
280 |
NH PWD Maharashtra MoRTH Project |
2017-2019 |
|
23 |
Up-gradation to Two Lanes with paved shoulder / Four lane Configurations of Nanded- Kinwat-Mahur- Arni (33Km) in the state of Maharashtra for Package- 1 from existing Km 21/000 at Bhokar to km 54/000 at Sarsamb Br (Design Km 0/000 (at Bhokar) to Km 33/000 (at Sarsamb Br). (Total Length = 33.000km). |
180 |
Maharashtra MoRTH Project- M/s Sharada Construction Corporation Pvt Ltd |
2017-2018 |
Complete detailed engineering for project in role of Design Director for the National Highway project including services for Survey, Investigation, Traffic engineering, detailed design (geometrics, pavement, hydraulics and structural) and all drawings including structures, etc complete and getting approved from Proof, Safety Consultants and Authority Engineer |
24 |
Two laning with Paved Shoulder for Chilpi Kawardha project in state of Chattisgarh- NH 12 A (Design Ch.191.422 to 242.300). (Total length - 50 Km) |
197 |
NH PWD Maharashtra MoRTH Project- M/s Topworth Infrastructure Pvt Ltd |
2017-2018 |
|
25 |
Construction of Two Lane with Paved Shoulder of Nashik - Peth Section of NH 848. – (Total Length 50 Km) |
190 |
NH PWD Maharashtra - M/s PBA-RAJ JV |
2016-2017 |
|
26 |
Pavement Evaluation, Design and Material testing, evaluation studies for SH 211 & SH 231 - AkkalkotWaghdari Road Project |
38 |
Public Works Department- Maharashtra State for Astute Infrastructure |
2012-2013 |
Pavement and Overlay Design, Complete subgrade and pavement evaluations studies |
27 |
Widening and improvement of Arnala-Virar- Shirsad- Ambadi- SH40 and Padgha- Washind Road MDR 45 under MMRDA, Maharsahtra State (Length of Road –43.84 Km 4 Laning Project) |
207.25 |
MMRDA through Monarch Consultants Pvt Ltd |
2011-2012 |
|
28 |
Pavement Design & Material investigation for: Widening and improvement of Kalyan to Hal Phata (SH 35) and Karjat to Chowk (SH 38) for MMRDA (Project Length 72.44 Km Four Laning and Project Cost Rs. 289.29 Crore) |
289.29 |
MMRDA through Monarch Consultants Pvt Ltd |
2011-2012 |
|
29 |
Pavement Evaluation, Design and Material testing, evaluation studies for Sangli Kolhapur BOT Project |
240 |
Public Work Department, Maharashtra State |
2011-2012 |
Pavement and Overlay Design, Complete subgrade and pavement evaluations studies, Geotechnical Investigation and Foundation designs for Bridges, Structures for SH 141 |
30 |
Pavement Evaluation, Design and Material testing, evaluation studies for SH 141 - KarmalaTembhurni Section (BOT Project) |
550 |
Supreme Infrastructure Pvt Ltd (Maharashtra PWD) |
2011-2012 |
Pavement and Overlay Design, Complete subgrade and pavement evaluations studies, Geotechnical Investigation and Foundation designs for Bridges, Structures for SH 141 |
31 |
Subgrade & Material Investigation for NH 6 (Amravati Bypass to Gujrat Border in state of Maharashtra) |
450 |
Louis Berger Consulting Engineers Pvt Ltd, Gurgaon for National Highway Authority of India (NHAI) |
2010-2011 |
Complete subgrade evaluation, testing & material study, subgrade report for 483 Km National Highway stretch for 4 Laning project |
32 |
Kolhapur IRDP Project - BOT Project of Internal City Roads |
250 |
Maharashtra State Road Development Corporation (IRB Infra Pvt Ltd) |
2009-2011 |
Pavement Design for KOLHAPUR IRDP Project Maharashtra State Road Development Corporation: Pavement design engineer for BOT project for Kolhapur City IRDP Project- under MSRDC, |
33 |
SH 7 – Shirwal on and Phaltan Baramati Project under PWD Maharashtra (BOT Project) |
250 |
Public Works Department- Maharashtra |
2009-2010 |
Pavement design for new carriageway rehabilitation and overlay of existing pavement – 4 LaningSH project |
34 |
Development of new link and creek bridge near Mumbai City |
600 |
Private entrepreneur- DB realty Projects |
2008-09 |
Development of a new link road for connection of suburbs near Mumbai City along with a Creek bridge |
35 |
Andhra Pradesh State Highway APSH 7 & 8 Project (World Bank assisted) |
150 |
Gayatri –IJM JV, Hyderabad, INDIA |
2004-2005 |
Forensic analysis of pavement structure in India |
36 |
Improvement to Saptarshrungi Gad Nanduri Abhona Kanashi Manur Aliyabad Road SH 21 Km 0+000 to 10+000 Tq. Kalwan. Dist-Nashik |
48.9 |
Public Works Department Nashik |
2023-24 |
Complete detailed engineering for project in role of Design Director for the National Highway project including services for Survey, Investigation, Traffic engineering, detailed design (geometrics, pavement, hydraulics and structural) and all drawings including structures, etc complete and getting approved from Proof, Safety Consultants and Authority Engineer |
37 |
Improvement to Aurangabad to Jalgaon Road NH-753F from km 89 + 800 to km 94 + 175 (Ajanta Ghat Portion) on EPC mode in the state of Maharashtra |
31.51 |
National Highway Division (PWD), Jalna |
2020-2024 |
|
38 |
Expert Advisor Services to Chief Engineer NH -PWD and MSRDC for all the NH projects in Nagpur and Aurangabad Region (Total 84 projects with Total length 3000 Km National Highways) |
14000 |
MoRTH, NH (PWD), MSRDC |
2018-2021 |
Technical Audits for National Highways Projects under NH PWD and MSRDC and MoRTH in Nagpur and Aurangabad Regions of Maharashtra for total length of 3000 Km and project cost approx. Rs. 14000 Crore in capacity as EXPERT ADVIOSR TO CHIEF ENGINEER, NH PWD and MSRDC |
39 |
Pavement Design & Material investigation for: Widening and improvement of Roads in PashimChamparan District of Bihar under Bihar Road State-Development Corporation Road upgradation program (Project Length 102.254 Km Four Laning) |
300 |
Bihar State Road Development Corporation |
2011-2012 |
Pavement and Overlay Design, Complete subgrade and pavement evaluations studies |
40 |
Four Laning of Amritsar Wagah Section of NH -1 under NHAI |
200 |
National Highway Authority of India |
2007 |
Pavement design for new carriageway rehabilitation and overlay of existing pavement – 4 Laning National Highway project |
Sr. No. |
Name of Project |
Project Cost (Rs. Crore) |
Project Agency |
Project Year |
Brief description of project activities |
1 |
Development of DP Road Pune-Nashik Highway from Panjarpol chowk to Chrholi Border of PCMC |
171.88 |
Pimpri Chinchwad Municipal Corporation |
2021-2023 |
Project Management Consultancy |
2 |
Project Management Consultancy Services for Development of 18m D P road in prabhag no.7 Charholi, Chowisawadi, Vadmukhwadi |
19.47 |
Pimpri Chinchwad Municipal Corporation |
2020-2023 |
|
3 |
Development of Streets in Akurdi area of Pimpri Chinchwad city as per Urban Street Design Guidelines (USDG) |
47.63 |
Pimpri Chinchwad Municipal Corporation |
2020-2023 |
Complete project management services for Pre tender and Post tender activities (design, drawings, supervision of all civil and utility works) for the Street Development project under Smart Cities Mission, |
4 |
Development of area under Rajmata Jijau Flyover at Bhosari as per USDG Guidelines |
28 |
Pimpri Chinchwad Municipal Corporation |
2020-2022 |
|
5 |
Development of DP Roads in MIDC area of Pimpri Chinchwad |
94.7 |
Pimpri Chinchwad Municipal Corporation |
2019-2021 |
Complete DPR, supervision and project management for project |
6 |
Project Management Consultancy Services for Improvement & Widening to 34.50m wide road to Ravet C.D. work to Walhekarwadi Chowk including underpass road in PCMC area. |
15.65 |
Pimpri Chinchwad Municipal Corporation |
2019-2021 |
Project Management Consultancy |
7 |
Rehabilitation of Thin White Topping (TWT) technology in PCMC area (various projects) |
138.51 |
Pimpri Chinchwad Municipal Corporation |
2018-2021 |
Complete Project management including DPR |
8 |
Development of PQC pavement roads from Chapekar Chowk to bridge on Pavana River Thergoan |
13.07 |
Pimpri Chinchwad Municipal Corporation |
2018-2021 |
|
9 |
Construction of PQC pavement from Chapekar chowk to Keshav Nagar Part II (Towards Kalewadi Road) |
11.9 |
Pimpri Chinchwad Municipal Corporation |
2018-2021 |
|
10 |
Concreting of Keshav Nagar Kalewadi road |
9.33 |
Pimpri Chinchwad Municipal Corporation |
2018-2021 |
Complete Project management including DPR preparation and supervision for the Urban Road projects until Completion |
11 |
Projecr Management Consultancy Services for Dismantling old vegetable Market building and constructing two storeyed vegetable market in ward no 35, Bhosari for PCMC. |
13.35 |
Pimpri Chinchwad Municipal Corporation |
2018-2021 |
|
12 |
Construction of various DP Roads in Charoli area of PCMC |
138.56 |
Pimpri Chinchwad Municipal Corporation |
2018-2020 |
|
13 |
Improvement and Development of Dehu - Alandi Road from CH-15/050 Km from Moshi Jadhavwadi Village to Alandi Village |
83.43 |
Pimpri Chinchwad Municipal Corporation |
2018-2020 |
|
14 |
Strengthening of Bus Docking area near BRTS Bus station – Kivale road (2 Lane, Length 576 m) |
4.36 |
Pimpri Chinchwad Municipal Corporation |
2018-2019 |
|
15 |
Improvement and Development of Dehu - Alandi Road from CH-0/000 to CH-8/250 Km from Dehu Village to Moshi Jadhavwadi Village Border |
114.43 |
Pimpri Chinchwad Municipal Corporation |
2017-2020 |
|
16 |
Development Beautification and concretization of roads in Sambhajinagar of PCMC Prabhag no.- 09.(4 Lane, Length 700m) |
4 |
Pimpri Chinchwad Municipal Corporation |
2017-2018 |
|
17 |
Construction of concrete road in Shahu nagar prabhag no-9 of PCMC area (4 Lane, Length 300m) |
5 |
Pimpri Chinchwad Municipal Corporation |
2017-2018 |
|
18 |
Development of cement concrete road in PCMC area.” (2 Lane, Length 980m) |
7 |
Pimpri Chinchwad Municipal Corporation |
2016-2017 |
|
19 |
Development of internal concrete road in prabhag no-9 of PCMC area” (2 Lane, Length 200m) |
2 |
Pimpri Chinchwad Municipal Corporation |
2016-2017 |
|
20 |
Development of Wakad DP Roads in PMC Area (Total Length 5.8 Km 4/6 Lane) |
42.54 |
Pimpri Chinchwad Municipal Corporation |
2013-2015 |
|
21 |
Dehu Alandi Road (6 Laning Project) for 30 m DP width in PCMC area - (Total length 15.05 Km- 6 lane) |
210 |
Pimpri Chinchwad Municipal Corporation |
2012-2016 |
|
22 |
Storm Water Drainage Improvement for PCMC D Ward Basins of Pimpri Chinchwad Municipal Corporation under JNNURM scheme |
87 |
Pimpri Chinchwad Municipal Corporation |
2011-2013 |
Complete DPR preparation, approval from JNNURM, New Delhi |
23 |
Improvement & development & resurfacing of DP roads in A Ward of PCMC (I) |
36 |
Pimpri Chinchwad Municipal Corporation |
2009-2010 |
Complete Project management including DPR preparation and supervision for the Urban Road projects until Completion |
24 |
Improvement & development & resurfacing of DP roads in A Ward of PCMC (II) |
45 |
Pimpri Chinchwad Municipal Corporation |
2009-2010 |
|
25 |
Development Improvement Maintenance & Resurfacing of internal roads in A Ward of PCMC |
11.67 |
Pimpri Chinchwad Municipal Corporation |
2008-2009 |
|
26 |
Pavement Management System Program for the integrated Road Development in the city of Pimpri Chinchwad |
140 |
Pimpri Chinchwad Municipal Corporation |
2007-2008 |
|
27 |
Improvement and resurfacing of Roads in A,B C & D Wards & MIDC of PCMC as per Pavement Management System |
56.92 |
Pimpri Chinchwad Municipal Corporation, Pimpri. |
2007-2008 |
|
28 |
Development of DP Roads in A,B C & D Wards of PCMC as per recommendations of Pavement Management System (Project length 35 Km) |
150 |
Pimpri Chinchwad Municipal Corporation, Pimpri. |
2007 -2009 |
|
29 |
Development and institution of a GIS based Pavement Management System for the Road network in the Municipal Corporation jurisdiction |
NA |
Pimpri Chinchwad Municipal Corporation, Pimpri. |
2006-2008 |
Ongoing project on overall maintenance management and budget allocation for the 380 Km Road network with the Municipal Corporation of Pimpri Chinchwad, India |
30 |
Maintenance & rehabilitation of Roads in A,B C & D Wards of PCMC as per Pavement Management System |
30 |
Pimpri Chinchwad Municipal Corporation, Pimpri. |
2006-2007 |
Maintenance and rehabilitation of Urban Roads in PCMC limits |
31 |
Improvement & rehabilitation of Mumbai Pune National Highway between Dapodi & Nigadi (Project length 9 km ) |
14 |
Pimpri Chinchwad Municipal Corporation |
2006 |
Rehabilitation of 10 Km Mumbai Pune National Highway stretch under PCMC limits |
32 |
IMPROVEMENT OF ROAD PUNE-SATARA FROM SWARGATE CHOWK TO KATRAJ CHOWK INCLUDING FOOTPATH, CYCLE TRACK UNDER B. R. T. (Total length – 5.5 Km- Eight lane Project) |
93.41 |
Pune Municipal Corporation |
2019-2023 |
Complete Project management including DPR and supervision for prestigious Bus Rapid Transit Project in Pune City |
33 |
Development of Streets in Aundh BanerBalewadi area of Pune city Under Smart Cities Mission as per Urban Street Design Guidelines (USDG) – 4.5 Km ABB area streets |
36 |
Pune Smart City Development Corporation |
2019- (ongoing) |
Project Management Consultancy |
34 |
Road Asset Management System (RAMS) for 1400 Km network of Pune City under Smart Cities Mission of Government of India |
NA |
Pune Smart City Corporation Ltd, Pune |
2017-2020 |
Development of a GIS based Asset Management system for Pune city Road network of 1400 Km roads which included complete asset and inventory data collection with NSV, development of new Software system RAMS and maintenance management recommendations for road network using HDM4 Package |
35 |
Development of Streets in Aundh-Baner Balewadi area of Pune city Under Smart Cities Mission as per Urban Street Design Guidelines (USDG) – 1.50 Km Pilot project |
22 |
Pune Smart City Development Corporation |
2017-2019 |
Complete Project management including DPR preparation and supervision for the Urban Road projects until Completion |
36 |
Development of 7.5m wide Road from Vadagaon BK to P. L. Deshpande Udyan along canal side, Pune (Total length 6.0 Km 2 lane) |
40 |
Pune Municipal Corporation |
2016-2019 |
|
37 |
Construction of Bridge over Ramnadi for 30m DP Road from Medi Point Hospital to Baner Sr.No. 221 and Development of 30m DP Road (Package V) |
76.02 |
Pune Municipal Corporation |
2014-2016 |
|
38 |
Construction of Bridge with apporoaches over Ramnadi for 12m DP Road in Prabhag No.9 Baner Sr.No. 218 to Sr.No. 221 ( package 7) |
48 |
Pune Municipal Corporation |
2014-2016 |
|
39 |
Development of 12m DP Road at Prabhag No. 9 Baner Sr.No. 227 to Vidhate wasti Sr.No. 279 and Sr.No. 244 |
6.08 |
Pune Municipal Corporation |
2013-2015 |
|
40 |
Development of 12m DP Road in Prabhag No. 9 Baner Pashan Athashree Road and Athashree Chowk to Ramnadi and 9m Road under clause 205 along Ramnadi Riverside to Sr.No. 135 Package II |
6.34 |
Pune Municipal Corporation |
2013-2015 |
|
41 |
Development of 18m and 12m DP roads in Sr.No. 34 towards Sr.No. 90, 12m DP Road backside BalewadiJakatnaka and 18m dP road in Balewadi Sr.No. 33 and Sr.No. 34 Package III |
11.13 |
Pune Municipal Corporation |
2013-2015 |
Complete Project management including DPR preparation and supervision for the Urban Road projects until Completion |
42 |
Development of Cocrete road in Prabhag No. 9 Hotel Sanja to Panjab Natioanal Bank Package IV |
50.09 |
Pune Municipal Corporation |
2013-2015 |
|
43 |
Development of Baner DP Roads in PMC Area (Total Length 6 Km 4 Lane) |
38 |
Pune Municipal Corporation |
2013-2015 |
|
44 |
Development of 2 Nos Bridges across River Ram (Total Bridge length 55 m each) |
18 |
Pune Municipal Corporation |
2012-2014 |
|
45 |
Development of 18 m DP Road from BSNL Office on Sinhagad Road uptoVadgaonBudruk along with Canal Bridge.(Bridge Length – 30m Canal Bridge + 15m Baby Canal Bridge] |
7 |
Pune Municipal Corporation |
2012-2013 |
|
46 |
Development of 30 m DP Road along with Canal Bridge from Ganga Bhaghyoday Building towards Vadgoan Bk on Sinhagad Road area. (Bridge Length – 30m Main Canal and 20 m on Baby canal) |
14 |
Pune Municipal Corporation |
2012-2013 |
|
47 |
Rehabilitation of Urban Roads with UTWT and Thin White Topping (TWT) technology in PMC area (various projects) (Total length 60 Km) |
125 |
Pune Municipal Corporation |
2011-2015 |
Complete Project management including DPR and supervision for Rehabilitation of urban roads using innovative UTWT above 60 Km length in Pune city |
48 |
Storm Water Drainage Improvement for BanerBalewadi Basin of Pune under JNNURM scheme |
73 |
Pune Municipal Corporation |
2011-2014 |
Complete Project Management Consultancy for SWD improvement works |
49 |
Storm Water Drainage Improvement for VadgaonBudruk Basin of Pune under JNNURM scheme |
44 |
Pune Municipal Corporation |
2011 -2013 |
Complete Project Management Consultancy for SWD improvement works |
50 |
Development of Mundhwa Bypass 45 m DP Road under JNNURM project (Project Length – 4 Km) |
35 |
Pune Municipal Corporation |
2010-2012 |
Full DPR and supervision, project management for development of major concrete arterial Road in PMC limit |
51 |
Third Party Inspection of Road, Building and SWD works in PMC Zonal Offices |
80 |
Pune Municipal Corporation |
2008-2009 |
Road Works, Building works and Storm Water drainage work of Zonal Offices in PMC area |
52 |
Development and institution of a GIS based Pavement Management System for the Road network in the Municipal Corporation jurisdiction |
NA |
Pune Municipal Corporation, Pimpri. |
2007-2009 |
Ongoing project on overall maintenance management and budget allocation for the 500 Km road network with the Municipal Corporation of Pune City, India |
53 |
Pavement Management System Maintenance & rehabilitation of Roads in various wards of Pune Municipal Corporation Pavement Management System |
55 |
Pune Municipal Corporation |
2007-2008 |
Complete DPR, supervision, project management of Urban Roads in PMC limits |
54 |
Safety Audit of Pilot BRTS works of Pune (Pune Satara Road and Pune Sholapur Road) |
NA |
Pune Municipal Corporation |
2014 |
Safety Audit of the completed BRTS project. |
55 |
Development & widening, resurfacing of NDA Road as per DP provisions for Pune Municipal Corporation |
11 |
Pune Municipal Corporation |
2009 |
Development of major sub arterial Road in PMC limit |
56 |
Development & widening, resurfacing of Pashan – Sus Road as per DP provisions for Pune Municipal Corporation |
10 |
Pune Municipal Corporation |
2008 |
Development of major sub arterial Road (8 Km) in PMC limit |
Sr. No. |
Name of Project |
Project Cost (Rs. Crore) |
Project Agency |
Project Year |
Brief description of project activities |
||
1 |
White Topping alomg with Reconstryction of 20 number of culverts of two lane paved shoulders of NH 61 ( old NH 222) from Malshej Ghat (from Km 161/570 to Km 161/570- Package-I), from Ane Ghat to Ahemdnagar Bypass (from Km 161/570 to Km 211/000- Package-II) & From Kharwandi Kasar to Junction of NH 211 (from Km 284/000 to Km 337/000- Package-III) of 163Km in the State of Maharashtra on EPC mode. |
254.57 |
National Highways Authority of India - T & T Infra Pvt. Ltd. |
2024-Ongoing |
Proof Checking of the drawings & Design |
||
2 |
Construction of Cement Concrete Roads and Drains of D.P.Roads under Maharshtra Suvarna Jayanti Nagarotthan Mahabhiyan Yogana in Municipal Council, Omerga Area Tq. Omerga, District Osmanabad (16 Roads), in the state of Maharashtra. |
99.8 |
PWD, Maharashtra - Vikram Infratech Developers Pvt. Ltd |
2024-Ongoing |
Proof Checking of the drawings & Design |
||
3 |
CONSULTANCY SERVICES FOR WIDENING TWO LANE WITH PAVED SHOULDER FROM KM 0.00 TO 24.00 OF NH-166E THE STATE OF KARNATAKA.(TIKOTA BIJJARGI KANAMADI MH BORDER SECTION) |
158.45 |
NH (PWD) Vijapur Division Karnataka -J.M.Mhatre Infra Pvt.Ltd |
2024-Ongoing |
Proof Checking of the drawings & Design |
||
4 |
FOR Rehabilitation and Upgradation of Jamkhed To Sautada Section of NH 548D from design Ch: Km 195.375 to Ch: Km 208.774 to two lane with paved shoulder/Four Lane configuration with rigid Pavement in the state of Maharashtra on EPC mode |
133.27 |
PWD, Maharashtra-Dhaneshwar Construction Private Limited |
2024-Ongoing |
Proof Checking of the drawings & Design |
||
5 |
A ) For Improvement to Karanja - Bharsingi - Mowad Bangaon Road ( SH 323 ) in Km 60/00 to 67/400 (Part Km 62/100 to 67/380) Tal Narkhed Dist Nagpur Maharashtra on Engineering, Procurement & Construction (EPC) Mode |
97.6 |
PWD, Maharashtra-Abhi Engineering Corporation Private Limited |
2024-Ongoing |
Proof Checking of the drawings & Design |
||
6 |
Design and Construction using Thin White Topping (TWT) including routine maintenance & balance works from KM. 42.000 to KM.179.946 (Total Length 137.946 KM) in the state of Maharashtra as standal one project on EPC Mode |
105.5 |
NHAI - Shankar Ramchandra Earthmovers Pvt Ltd |
2024-Ongoing |
Proof Checking of the drawings & Design |
||
7 |
“Construction of New bypass cement concrete road of two lane with earthen shoulders purna road to malegaon road to hingoli road SH-247 (Nanded city Northern Bypass) km 0/000 to 6/000 Tq. Nanded Dist. Nanded (Actual Chainage 9/000 to 16/100).” |
78.59 |
PWD, Maharashtra-SHARDA Construction & Corporation Pvt. Ltd |
2024-Ongoing |
Proof Checking of the drawings & Design |
||
8 |
“Construction of Cement Concrete Road with Land Acquisition from NH-752 I to Chondi Kurunda Malegaon Taroda Bk Road SH-435 From Km 23/600 to Km 37/800, Tq. Nanded Dist Nanded. (Taroda Malegaon Project)” |
106.78 |
PWD, Maharashtra-SHARDA Construction & Corporation Pvt. Ltd |
2024-Ongoing |
Proof Checking of the drawings & Design |
||
9 |
EPC-21 Improvement of Kalyan Nagar Pathirdi Parbhani Nanded Bhokar Malsha Nirmal Road NH 61 km 592/00 to 615/00 (Total Length 22.03km) (Part-Bhokar-Rahati to State Border),Bhokar,District Nanded,Maharashtra on EPC mode. |
90 |
NH PWD Maharashtra MoRTH Project |
2022-23 |
Proof Checking of the drawings & Design |
||
10 |
Providing Two laned Paved shoulder in Km 311/800 to Km 340/00 (Aurangabad- Nagar Naka-Ellora) of NH-211 in the State of Maharashtra on EPC mode. (Total length 29 Km) |
90 |
NH PWD Maharashtra MoRTH Project |
2015 |
Proof Consultant for project appointed by NH PWD Maharashtra |
||
11 |
DEVELOPMENT AND OPERATION OF AHMEDNAGAR-PATHARDI SECTION OF NH-222 (FROM KM 232+000 TO KM 284+000) IN THE STATE OF MAHARASHTRA (Total length 52 Km) |
180 |
NH PWD Maharashtra MoRTH Project |
2015 |
Proof Consultant for project appointed by NH PWD Maharashtra |
||
12 |
White Topping alomg with Reconstryction of 20 number of culverts of two lane paved shoulders of NH 61 ( old NH 222) from Malshej Ghat (from Km 161/570 to Km 161/570- Package-I), from Ane Ghat to Ahemdnagar Bypass (from Km 161/570 to Km 211/000- Package-II) & From Kharwandi Kasar to Junction of NH 211 (from Km 284/000 to Km 337/000- Package-III) of 163Km in the State of Maharashtra on EPC mode. |
254.57 |
National Highways Authority of India - T & T Infra Pvt. Ltd. |
2024-Ongoing |
Safety Audits at Design, Implementation and Completion Stages for the Project as Safety Consultant |
||
13 |
Construction of Cement Concrete Roads and Drains of D.P.Roads under Maharshtra Suvarna Jayanti Nagarotthan Mahabhiyan Yogana in Municipal Council, Omerga Area Tq. Omerga, District Osmanabad (16 Roads), in the state of Maharashtra. |
99.8 |
PWD, Maharashtra - Vikram Infratech Developers Pvt. Ltd |
2024-Ongoing |
Proof Checking of the drawings & Design |
||
14 |
CONSULTANCY SERVICES FOR WIDENING TWO LANE WITH PAVED SHOULDER FROM KM 0.00 TO 24.00 OF NH-166E THE STATE OF KARNATAKA.(TIKOTA BIJJARGI KANAMADI MH BORDER SECTION) |
158.45 |
NH (PWD) Vijapur Division Karnataka -J.M.Mhatre Infra Pvt.Ltd |
2024-Ongoing |
Safety Audits at Design, Implementation and Completion Stages for the Project as Safety Consultant |
||
15 |
FOR Rehabilitation and Upgradation of Jamkhed To Sautada Section of NH 548D from design Ch: Km 195.375 to Ch: Km 208.774 to two lane with paved shoulder/Four Lane configuration with rigid Pavement in the state of Maharashtra on EPC mode |
133.27 |
PWD, Maharashtra-Dhaneshwar Construction Private Limited |
2024-Ongoing |
|||
16 |
A ) For Improvement to Karanja - Bharsingi - Mowad Bangaon Road ( SH 323 ) in Km 60/00 to 67/400 (Part Km 62/100 to 67/380) Tal Narkhed Dist Nagpur Maharashtra on Engineering, Procurement & Construction (EPC) Mode. |
97.6 |
PWD, Maharashtra-Abhi Engineering Corporation Private Limited |
2024-Ongoing |
|||
17 |
“Construction of Cement Concrete Road with Land Acquisition from NH-752 I to Chondi Kurunda Malegaon Taroda Bk Road SH-435 From Km 23/600 to Km 37/800, Tq. Nanded Dist Nanded. (Taroda Malegaon Project)” |
106.78 |
PWD, Maharashtra-SHARDA Construction & Corporation Pvt. Ltd |
2024-Ongoing |
|||
18 |
“Construction of High-level Bridge across Asna River on Malegaon to Taroda Naka Road MDR-93 Near Pasadgaon village, at Km 10/00 Tq. & dist. Nanded (With Land Acquisition) [FORM – C].” |
23.32 |
PWD, Maharashtra-SHARDA Construction & Corporation Pvt. Ltd |
2024-2024 |
|||
19 |
Up-Gradation /Reconstruction to two lanes with Paved Shoulder (Package No. Nashik- Iv)-Nhavara-Inamgaon-Kashti-shrigonda Adhalgaon-Jalgaon-Jamkhed of SH-55 (New- NH-548D) Section II; Adhalgaon (Km 132+600) to Jamkhed (Km195+375).Length- 62.775 km,In the state of Maharashtra on EPC Mode. |
350 |
NH PWD Maharashtra MoRTH Project |
2022-23 |
|||
20 |
Construction of CC Road and RCC Drain for the folloeing Road Section : 1. Juna Mondha-Godavari River Bridge- Dr.Ambedkar chowk Road SH-256 Part Km 72/200 to 75/700 Package154/1Length=3.000Km and 2. Nanded Latur Road –Bhagat singh Chowk-Godavari River New Bridge (West Bypass Road) SH-247 Part Km 0/000 to 4/600 ,Package 154/2,Length =2.380 km |
93.32 |
PWD Maharashtra MoRTH Project |
2021-22 |
|||
21 |
Improvement /Widening to two Lane of Gadchandur-Patan-Wani Road (SH-373) Total Length 53 KM (2nd call) UNDER Hybrid Annuity Package No.NAG.142 |
108 |
PWD Maharashtra MoRTH Project |
2021-22 |
Safety Audits at Design, Implementation and Completion Stages for the Project as Safety Consultant |
||
22 |
Improvement /Widening to two Lane of Bhoyegaon-Gadchandur-Jiwati Road (SH-373) Total Length 21 KM (2nd call) UNDER Hybrid Annuity Package No.NAG.142 |
106 |
PWD Maharashtra MoRTH Project |
2021-22 |
|||
23 |
Two Laning Paved Shoulder for NH-218 from Design Ch.4.400 to 56.000 (Bijapur Hubli Section Package I) in the State of Karnataka – (Total length 51.4 Km) |
190 |
NH PWD Karnataka MoRTH Project |
2017-2018 |
Safety Consultants for the project appointed by NH PWD Karnataka |
||
24 |
REHABILITATION & STRENTHENING OF NH- 222 for Two Lane with Paved Shoulder under NHDP IV Km 101/00 to 161/570 IN STATE OF MAHARASHTRA. – (Total length 60 Km) |
230 |
NH PWD Maharashtra MoRTH Project |
2016-2017 |
Safety Audits at Design, Implementation and Completion Stages for the Project as Safety Consultant |
Worked on material characterization, data analysis and final report preparation of this study, aimed at identifying suitable validation projects within the Commonwealth of Pennsylvania and to characterize asphalt binders and mixtures for Super Pave, a new and advanced procedure for selecting and designing asphalt paving mixtures in the US.
Worked on development of the new NECEPT Database, used for the compilation of the QC/QA test results by State DOTs and asphalt binder suppliers. The database has been proven to be a very systematic and user friendly tool for handling and analyzing the binder test data for research objectives.
Devised a new statistical procedure for acceptance and payment for PG binders based upon the within laboratory and between laboratory testing variability. Developed a new dispute resolution scheme to balance the risk between the asphalt binder supplier, hot mix contractor and the state agency that will form part of the Quality Assurance and acceptance plan of State DOTs.
Worked in close association with NECEPT personnel for coordination of training workshops in the area of Hot Mix Asphalt Concrete construction.
Worked for the Super pave In-Situ Stress/Strain Investigation a significant Penn Dot project for calibration and validation of performance prediction models of the AASHTO 2003 Pavement Design Guide. Work included instrumentation of pavements, material sampling, construction operation monitoring, laboratory testing, material characterization, static and dynamic data acquisition and analysis.