DETAILED ENGINEERING DESIGN AND DPR PROJECTS

Select Number Of Rows

Sr. No.

Name of Project

Project Cost (Rs. Crore)

Project Agency

Project Year

Brief description of project activities

1

CONSULTANCY SERVICES FOR WIDENING TWO LANE WITH PAVED SHOULDER FROM KM 0.00 TO 24.00 OF NH-166E THE STATE OF KARNATAKA.(TIKOTA BIJJARGI KANAMADI MH BORDER SECTION)

158.45

NH (PWD) Vijapur Division Karnataka -VM Matere Infrastrucre Pvt Ltd

2024-Ongoing

Complete detailed engineering for project in role of Design Director for the National Highway project including services for Survey, Investigation, Traffic engineering, detailed design (geometrics, pavement, hydraulics and structural) and all drawings including structures, etc complete and getting approved from Proof, Safety Consultants and Authority Engineer

2

“CONSTRUCTION & DEVELOPMENT OF ROAD AND GHAT ON WESTERN BYPASS TO VAJEGAON BANDHARA (GODAVARI RIVERSIDE) KM 0/000 TO 6/000 ON LINK ROAD NO 03 SH 247 TQ. DIST NANDED (ACTUALCHAINAGE FROM4/300TO6/000)”

94.8

PWD, Maharashtra - SHARDA Construction & Corporation Pvt. Ltd

2024-Ongoing

3

Construction of New bypass cement concrete road of two lane with earthen shoulders purna road to malegaon road to hingoli road SH-247 (Nanded city Northern Bypass) km 0/000 to 6/000 Tq.
Nanded Dist. Nanded (Actual Chainage 9/000 to 16/100).”

77.59

PWD, Maharashtra-SHARDA Construction & Corporation Pvt. Ltd

2024-Ongoing

4

“Construction of Cement Concrete Road with Land Acquisition from NH-752 I to Chondi Kurunda Malegaon Taroda Bk Road SH-435 From Km 23/600 to Km 37/800, Tq. Nanded Dist Nanded. (Taroda Malegaon Project)”

106.78

PWD, Maharashtra-SHARDA Construction & Corporation Pvt. Ltd

2024-Ongoing

5

Construction of Cement Concrete Roads and Drains of D.P.Roads under Maharshtra Suvarna Jayanti Nagarotthan Mahabhiyan Yogana in Municipal Council, Omerga Area Tq. Omerga, District Osmanabad (16 Roads), in the state of Maharashtra.

99.8

PWD, Maharashtra - Vikram Infratech Developers Pvt. Ltd

2024-Ongoing

6

“Construction of High-level Bridge across Asna River on Malegaon to Taroda Naka Road MDR-93 Near Pasadgaon village, at Km 10/00 Tq. & dist. Nanded (With Land Acquisition) [FORM – C].”

23.32

PWD, Maharashtra - SHARDA Construction & Corporation Pvt. Ltd

2024-2024

Complete detailed engineering for project in role of Design Director for the National Highway project including services for Survey, Investigation, Traffic engineering, detailed design (geometrics, pavement, hydraulics and structural) and all drawings including structures, etc complete and getting approved from Proof, Safety Consultants and Authority Engineer

7

Construction of Major Bridge including construction of approach road & RCC gutter on Sina River at km 214.130 of Kalyan Ahmednagar Pathardi road NH-61 (Old NH-222) in the State of Maharashtra.strict in the State of Maharashtra on EPC Mode.

23.42

PWD, Maharashtra - Motilal Dhoot Infrastructure Pvt. Ltd

2023-Ongoing

8

FOR Rehabilitation and Upgradation of Jamkhed To Sautada Section of NH 548D from design Ch: Km 195.375 to Ch: Km 208.774 to two lane with paved shoulder/Four Lane configuration with rigid Pavement in the state of Maharashtra on EPC mode

133.27

PWD, Maharashtra-Dhaneshwar Construction Private Limited 

2023-24

9

Construction of Bypass to Mozari Town on NH-53 Taluka-Tiwasa,Dist-Amaravati (Existing Km-118/700 to 124/400) (Design Chainage-Km-0+000 to 6+100) in the state of Maharashtra on EPC mode

104

NHAI- Drishti structural engineering private limited

2022-23

10

Four –Laning form Km.0/000 (Panvel) to km 42.300 (Kasu) in the state of Maharashtra on EPC Mode

160

NHAI- M.s JM Mhatre Infrastructure Pvt Ltd, Mumbai

2022-23

11

EPC-17 Improvement of NIla junction – Brahmanwada –Amdura-Malkautha –Balegaon- Koregaon phata-Babli 3Phata-Bellure to Naigaon to state Border MDR-83 in Nanded Dist .1) Part of Nila junction to Mugat junction Km 0/0 to 14/815 ,2)Cahitanya Nagar Shiv Mandir to Asna Bridge junction Km0/00 to 3/515, 3) Brahmanwada Bypass km 0/00 to 1/590(Total Length 19.920) Dist .Nanded ,Maharashtra.

180

PWD Maharashtra MoRTH Project - Shreeji Infratech Private Limited

2022-23

12

EPC-18 Improvement of Nila Junction Brahmanwada-Amdura-Malkautha- BelegaonKaregaonPhata-Babli Phata- BellurtoNaigaon to State Border MDR-83 In NAnded Dist .1) Part of Mugat junction to Khujda junction Km 14/815 to 34/750,2) Aamdura Bypass Malkautha Bypass Km 0/00 to 1/975 (Total Length 25.835)

235

PWD Maharashtra MoRTH Project - Nuovogen Buildtech Private Limited

2022-23

Complete detailed engineering for project in role of Design Director for the National Highway project including services for Survey, Investigation, Traffic engineering, detailed design (geometrics, pavement, hydraulics and structural) and all drawings including structures, etc complete and getting approved from Proof, Safety Consultants and Authority Engineer

13

EPC-19 Improvement of NIla junction – Brahmanwada –Amdura-Malkautha –Balegaon- Koregaon phata-Babli 3Phata-Bellure to Naigaon to state Border MDR-83 in Nanded Dist .1) Part of Khujda junction to Koregaon Phata Km 34/750 to60/400 (Total Length 25.650) Dist .Nanded, Maharashtra on EPC Mode

245

PWD, Maharashtra - SHARDA Construction & Corporation Pvt. Ltd

2022-23

14

Improvement to Sonala-Rodgi-Pangri-Loni (BK.)-Loni (Kh)-Bharsgaon-Yelegaon-Degaon-pimpalgaon(M)-Shelgaon(BK.)-Shelgaon(Kh.) Kamth road MDR-27 Km.10/00 to 14/600 (Part Barasgaon pati to Bhaurao Cooperative Sigar Factory) & Degaon-Jawala (Patak)-Jawala (Murar)- Niwagha to SH 261 Road MDR-23 Km.0/00 to 4/00 (Part NH-361 Bhaurao Cooperative Sigar Factory) (4.00KM) Tq. Ardhapur Dist.Nanded in the state of Maharashtra on Engineering, Procurement & construction (EPC) Mode

54.15

PWD Maharashtra - Shree Kashi Vishwanath Infra Projects Private limited, Nanded

2022-2023

15

Widening and up-gradation by concreting to 2 Lane with Paved Shoulder of Kalyan –Nirmal road in Km .11/700 to 15/200 of NH 61 in Thane District in the km.11/700 to 15/200 of NH-61 in Thane District in the state of Maharashtra

50

NH PWD Maharashtra MoRTH Project - Caprigo Infrastructure Pvt Ltd

2021-22

16

162.1Construction of CC Road & RCC Drain from (A) DIG office –Bhagat Singh Chowk Sh-247 Part km 0/000 to 1/630 and 162.2Construction of CC Road & RCC Drain from Bomb Detect & Defuse Squad office – Jivali Mahale Chowk (Mama Chowk)-Western Bypass SH-247Part Km 00/000 to 1/430 In nanded city (TAluka and District –Nanded) In the state of Maharashtra.

64.57

PWD Maharashtra MoRTH Project

2021-22

17

Improvements to Math Kudal-Shivdav-Kadgaon- Gargoti Road, SH-179, Km 55/000 to 94/000, Tal. Bhudargad, in Kolhapur District in the state of Maharashtra (Total Length – 39 Km)

106

PWD Maharashtra - KRISHNAE INFRASTRUCTURE PRIVATE LIMITED

2019-2020

Complete detailed engineering for project in role of Design Director for the National Highway project including services for Survey, Investigation, Traffic engineering, detailed design (geometrics, pavement, hydraulics and structural) and all drawings including structures, etc complete and getting approved from Proof, Safety Consultants and Authority Engineer

18

Upgradation from Bamni to Navegaon Section of NH 353B Design Chainage – from km 242+150 to km 284+400 of Chandrapur- Ballarpur-Kothari-Gondpipri- Ashti Road to two lane with Paved Shoulders / four lane configuration in the state of Maharashtra on EPC mode. (Total length – 42.2 Km)

164

NH PWD Maharashtra MoRTH Project - Balaji Infratech & Construction Pvt.Ltd

2018-2019

19

Improvement to Khandwa, Bhendwal, Paturda, Ukli, Ner, Nandkhed, Kinkhed, Daryapur, Asegaon, Chandur, Bazar, SH 278 road in km 0/000 to 33/500 Taluka Jalgaon(J) & Sangrampur Dist. Buldhana. (Total Length – 33.50 Km)

78

PWD Maharashtra - KRISHNAE INFRASTRUCTURE PRIVATE LIMITED

2018-2019

20

Widening & strnghtning of existing highway section to two laning with paved shoulder of NH-848, which includes section from Km 16+000 to Km 34+000 Km to 57/000 & Km 62/000 to 65/600 (approximately 39.600 Km) in Nashik district in the state of Maharashtra on EPC Mode.

37

NH- PWD Maharashtra- M/s Nikhil Construction Pvt LTd, Pune

2018-2019

21

Rehabilitation and Up-gradation of Ahmedpur to Pimpla Junction from Existing Km 183+000 (Ahmedpur on SH 56) to Existing Km 127+885 (Pimpla junction on SH 56) (Design km 0+00 to km 55+623) of AhmedpurKinagaon-Ambejogai- Kaij- Manjarsumbha-Patoda-Jamkhed SH 56 road to Two lane with paved shoulders instate of Maharashtra. – (Total length 55.60 Km)

300

MSRDC, MoRTH Project

2017-2019

Detailed Topographic survey, Geotechnical investigation, soil testing, inventory survey and traffic surveys for the detailed design for NH Project

22

Up-gradation of Section 55+937 Km to 114+486 Km of NH-75 2E from Shirur to Kharda in the state of Maharashtra on EPC Mode. – (Total length 58.5 Km)

280

NH PWD Maharashtra MoRTH Project

2017-2019

23

Up-gradation to Two Lanes with paved shoulder / Four lane Configurations of Nanded- Kinwat-Mahur- Arni (33Km) in the state of Maharashtra for Package- 1 from existing Km 21/000 at Bhokar to km 54/000 at Sarsamb Br (Design Km 0/000 (at Bhokar) to Km 33/000 (at Sarsamb Br). (Total Length = 33.000km).

180

Maharashtra MoRTH Project- M/s Sharada Construction Corporation Pvt Ltd

2017-2018

Complete detailed engineering for project in role of Design Director for the National Highway project including services for Survey, Investigation, Traffic engineering, detailed design (geometrics, pavement, hydraulics and structural) and all drawings including structures, etc complete and getting approved from Proof, Safety Consultants and Authority Engineer

24

Two laning with Paved Shoulder for Chilpi Kawardha project in state of Chattisgarh- NH 12 A (Design Ch.191.422 to 242.300). (Total length - 50 Km)

197

NH PWD Maharashtra MoRTH Project- M/s Topworth Infrastructure Pvt Ltd

2017-2018

25

Construction of Two Lane with Paved Shoulder of Nashik - Peth Section of NH 848. – (Total Length 50 Km)

190

NH PWD Maharashtra - M/s PBA-RAJ JV

2016-2017

26

Pavement Evaluation, Design and Material testing, evaluation studies for SH 211 & SH 231 - AkkalkotWaghdari Road Project

38

Public Works Department- Maharashtra State for Astute Infrastructure

2012-2013

Pavement and Overlay Design, Complete subgrade and pavement evaluations studies

27

Widening and improvement of Arnala-Virar- Shirsad- Ambadi- SH40 and Padgha- Washind Road MDR 45 under MMRDA, Maharsahtra State (Length of Road –43.84 Km 4 Laning Project)

207.25

MMRDA through Monarch Consultants Pvt Ltd

2011-2012

28

Pavement Design & Material investigation for: Widening and improvement of Kalyan to Hal Phata (SH 35) and Karjat to Chowk (SH 38) for MMRDA (Project Length 72.44 Km Four Laning and Project Cost Rs. 289.29 Crore)

289.29

MMRDA through Monarch Consultants Pvt Ltd

2011-2012

29

Pavement Evaluation, Design and Material testing, evaluation studies for Sangli Kolhapur BOT Project

240

Public Work Department, Maharashtra State

2011-2012

Pavement and Overlay Design, Complete subgrade and pavement evaluations studies, Geotechnical Investigation and Foundation designs for Bridges, Structures for SH 141

30

Pavement Evaluation, Design and Material testing, evaluation studies for SH 141 - KarmalaTembhurni Section (BOT Project)

550

Supreme Infrastructure Pvt Ltd (Maharashtra PWD)

2011-2012

Pavement and Overlay Design, Complete subgrade and pavement evaluations studies, Geotechnical Investigation and Foundation designs for Bridges, Structures for SH 141

31

Subgrade & Material Investigation for NH 6 (Amravati Bypass to Gujrat Border in state of Maharashtra)

450

Louis Berger Consulting Engineers Pvt Ltd, Gurgaon for National Highway Authority of India (NHAI)

2010-2011

Complete subgrade evaluation, testing & material study, subgrade report for 483 Km National Highway stretch for 4 Laning project

32

Kolhapur IRDP Project - BOT Project of Internal City Roads

250

Maharashtra State Road Development Corporation (IRB Infra Pvt Ltd)

2009-2011

Pavement Design for KOLHAPUR IRDP Project Maharashtra State Road Development Corporation: Pavement design engineer for BOT project for Kolhapur City IRDP Project- under MSRDC,

33

SH 7 – Shirwal on and Phaltan Baramati Project under PWD Maharashtra (BOT Project)

250

Public Works Department- Maharashtra

2009-2010

Pavement design for new carriageway rehabilitation and overlay of existing pavement – 4 LaningSH project

34

Development of new link and creek bridge near Mumbai City

600

Private entrepreneur- DB realty Projects

2008-09

Development of a new link road for connection of suburbs near Mumbai City along with a Creek bridge

35

Andhra Pradesh State Highway APSH 7 & 8 Project (World Bank assisted)

150

Gayatri –IJM JV, Hyderabad, INDIA

2004-2005

Forensic analysis of pavement structure in India

36

Improvement to Saptarshrungi Gad Nanduri Abhona Kanashi Manur Aliyabad Road SH 21 Km 0+000 to 10+000 Tq. Kalwan. Dist-Nashik

48.9

Public Works Department Nashik

2023-24

Complete detailed engineering for project in role of Design Director for the National Highway project including services for Survey, Investigation, Traffic engineering, detailed design (geometrics, pavement, hydraulics and structural) and all drawings including structures, etc complete and getting approved from Proof, Safety Consultants and Authority Engineer

37

Improvement to Aurangabad to Jalgaon Road NH-753F from km 89 + 800 to km 94 + 175 (Ajanta Ghat Portion) on EPC mode in the state of Maharashtra 

31.51

National Highway Division (PWD), Jalna

2020-2024

38

Expert Advisor Services to Chief Engineer NH -PWD and MSRDC for all the NH projects in Nagpur and Aurangabad Region (Total 84 projects with Total length 3000 Km National Highways)

14000

MoRTH, NH (PWD), MSRDC

2018-2021

Technical Audits for National Highways Projects under NH PWD and MSRDC and MoRTH in Nagpur and Aurangabad Regions of Maharashtra for total length of 3000 Km and project cost approx. Rs. 14000 Crore in capacity as EXPERT ADVIOSR TO CHIEF ENGINEER, NH PWD and MSRDC

39

Pavement Design & Material investigation for: Widening and improvement of Roads in PashimChamparan District of Bihar under Bihar Road State-Development Corporation Road upgradation program (Project Length 102.254 Km Four Laning)

300

Bihar State Road Development Corporation

2011-2012

Pavement and Overlay Design, Complete subgrade and pavement evaluations studies

40

Four Laning of Amritsar Wagah Section of NH -1 under NHAI

200

National Highway Authority of India

2007

Pavement design for new carriageway rehabilitation and overlay of existing pavement – 4 Laning National Highway project

URBAN ROAD DESIGN AND PROJECT MANAGEMENT CONSULTING PROJECTS

Select Number Of Rows

Sr. No.

Name of Project

Project Cost (Rs. Crore)

Project Agency

Project Year

Brief description of project activities

1

Development of DP Road Pune-Nashik Highway from Panjarpol chowk to Chrholi Border of PCMC

171.88

Pimpri Chinchwad Municipal Corporation

2021-2023

Project Management Consultancy

2

Project Management Consultancy Services for Development of 18m D P road in prabhag no.7 Charholi, Chowisawadi, Vadmukhwadi

19.47

Pimpri Chinchwad Municipal Corporation

2020-2023

3

Development of Streets in Akurdi area of Pimpri Chinchwad city as per Urban Street Design Guidelines (USDG)

47.63

Pimpri Chinchwad Municipal Corporation

2020-2023

Complete project management services for Pre tender and Post tender activities (design, drawings, supervision of all civil and utility works) for the Street Development project under Smart Cities Mission,

4

Development of area under Rajmata Jijau Flyover at Bhosari as per USDG Guidelines

28

Pimpri Chinchwad Municipal Corporation

2020-2022

5

Development of DP Roads in MIDC area of Pimpri Chinchwad

94.7

Pimpri Chinchwad Municipal Corporation

2019-2021

Complete DPR, supervision and project management for project

6

Project Management Consultancy Services for Improvement & Widening to 34.50m wide road to Ravet C.D. work to Walhekarwadi Chowk including underpass road in PCMC area.

15.65

Pimpri Chinchwad Municipal Corporation

2019-2021

Project Management Consultancy

7

Rehabilitation of Thin White Topping (TWT) technology in PCMC area (various projects)

138.51

Pimpri Chinchwad Municipal Corporation

2018-2021

Complete Project management including DPR
and supervision

8

Development of PQC pavement roads from Chapekar Chowk to bridge on Pavana River Thergoan

13.07

Pimpri Chinchwad Municipal Corporation

2018-2021

9

Construction of PQC pavement from Chapekar chowk to Keshav Nagar Part II (Towards Kalewadi Road)

11.9

Pimpri Chinchwad Municipal Corporation

2018-2021

10

Concreting of Keshav Nagar Kalewadi road

9.33

Pimpri Chinchwad Municipal Corporation

2018-2021

Complete Project management including DPR preparation and supervision for the Urban Road projects until Completion

11

Projecr Management Consultancy Services for Dismantling old vegetable Market building and constructing two storeyed vegetable market in ward no 35, Bhosari for PCMC.

13.35

Pimpri Chinchwad Municipal Corporation

2018-2021

12

Construction of various DP Roads in Charoli area of PCMC

138.56

Pimpri Chinchwad Municipal Corporation

2018-2020

13

Improvement and Development of Dehu - Alandi Road from CH-15/050 Km from Moshi Jadhavwadi Village to Alandi Village

83.43

Pimpri Chinchwad Municipal Corporation

2018-2020

14

Strengthening of Bus Docking area near BRTS Bus station – Kivale road (2 Lane, Length 576 m)

4.36

Pimpri Chinchwad Municipal Corporation

2018-2019

15

Improvement and Development of Dehu - Alandi Road from CH-0/000 to CH-8/250 Km  from Dehu Village to Moshi Jadhavwadi Village Border

114.43

Pimpri Chinchwad Municipal Corporation

2017-2020

16

Development Beautification and concretization of roads in Sambhajinagar of PCMC Prabhag no.- 09.(4 Lane, Length 700m)

4

Pimpri Chinchwad Municipal Corporation

2017-2018

17

Construction of concrete road in Shahu nagar prabhag no-9 of PCMC area (4 Lane, Length 300m)

5

Pimpri Chinchwad Municipal Corporation

2017-2018

18

Development of cement concrete road in PCMC area.” (2 Lane, Length 980m)

7

Pimpri Chinchwad Municipal Corporation

2016-2017

19

Development of internal concrete road in prabhag no-9 of PCMC area” (2 Lane, Length 200m)

2

Pimpri Chinchwad Municipal Corporation

2016-2017

20

Development of Wakad DP Roads in PMC Area (Total Length 5.8 Km 4/6 Lane)

42.54

Pimpri Chinchwad Municipal Corporation

2013-2015

21

Dehu Alandi Road (6 Laning Project) for 30 m DP width in PCMC area - (Total length 15.05 Km- 6 lane)

210

Pimpri Chinchwad Municipal Corporation

2012-2016

22

Storm Water Drainage Improvement for PCMC D Ward Basins of Pimpri Chinchwad Municipal Corporation under JNNURM scheme

87

Pimpri Chinchwad Municipal Corporation

2011-2013

Complete DPR preparation, approval from JNNURM, New Delhi

23

Improvement & development & resurfacing of DP roads in A Ward of PCMC (I)

36

Pimpri Chinchwad Municipal Corporation

2009-2010

Complete Project management including DPR preparation and supervision for the Urban Road projects until Completion

24

Improvement & development & resurfacing of DP roads in A Ward of PCMC (II)

45

Pimpri Chinchwad Municipal Corporation

2009-2010

25

Development Improvement Maintenance & Resurfacing of internal roads in A Ward of PCMC

11.67

Pimpri Chinchwad Municipal Corporation

2008-2009

26

Pavement Management System Program for the integrated Road Development in the city of Pimpri Chinchwad

140

Pimpri Chinchwad Municipal Corporation

2007-2008

27

Improvement and resurfacing of Roads in A,B C & D Wards & MIDC of PCMC as per Pavement Management System

56.92

Pimpri Chinchwad Municipal Corporation, Pimpri.

2007-2008

28

Development of DP Roads in A,B C & D Wards of PCMC as per recommendations of Pavement Management System (Project length 35 Km)

150

Pimpri Chinchwad Municipal Corporation, Pimpri.

2007 -2009

29

Development and institution of a GIS based Pavement Management System for the Road network in the Municipal Corporation jurisdiction

NA

Pimpri Chinchwad Municipal Corporation, Pimpri.

2006-2008

Ongoing project on overall maintenance management and budget allocation for the 380 Km Road network with the Municipal Corporation of Pimpri Chinchwad, India

30

Maintenance & rehabilitation of Roads in A,B C & D Wards of PCMC as per Pavement Management System

30

Pimpri Chinchwad Municipal Corporation, Pimpri.

2006-2007

Maintenance and rehabilitation of Urban Roads in PCMC limits

31

Improvement & rehabilitation of Mumbai Pune National Highway between Dapodi & Nigadi (Project length 9 km )

14

Pimpri Chinchwad Municipal Corporation

2006

Rehabilitation of 10 Km Mumbai Pune National Highway stretch under PCMC limits

32

IMPROVEMENT OF ROAD PUNE-SATARA FROM SWARGATE CHOWK TO KATRAJ CHOWK INCLUDING FOOTPATH, CYCLE TRACK UNDER B. R. T. (Total length – 5.5 Km- Eight lane Project)

93.41

Pune Municipal Corporation

2019-2023

Complete Project management including DPR and supervision for prestigious Bus Rapid Transit Project in Pune City

33

Development of Streets in Aundh BanerBalewadi area of Pune city Under Smart Cities Mission as per Urban Street Design Guidelines (USDG) – 4.5 Km ABB area streets

36

Pune Smart City Development Corporation

2019- (ongoing)

Project Management Consultancy

34

Road Asset Management System (RAMS) for 1400 Km network of Pune City under Smart Cities Mission of Government of India

NA

Pune Smart City Corporation Ltd, Pune

2017-2020

Development of a GIS based Asset Management system for Pune city Road network of 1400 Km roads which included complete asset and inventory data collection with NSV, development of new Software system RAMS and maintenance management recommendations for road network using HDM4 Package

35

Development of Streets in Aundh-Baner Balewadi area of Pune city Under Smart Cities Mission as per Urban Street Design Guidelines (USDG) – 1.50 Km Pilot project

22

Pune Smart City Development Corporation

2017-2019

Complete Project management including DPR preparation and supervision for the Urban Road projects until Completion

36

Development of 7.5m wide Road from Vadagaon BK to P. L. Deshpande Udyan along canal side, Pune (Total length 6.0 Km 2 lane)

40

Pune Municipal Corporation

2016-2019

37

Construction of Bridge over Ramnadi for 30m DP Road from Medi Point Hospital to Baner Sr.No. 221 and Development of 30m DP Road (Package V)

76.02

Pune Municipal Corporation

2014-2016

38

Construction of Bridge with apporoaches over Ramnadi for 12m DP Road in Prabhag No.9 Baner Sr.No. 218 to Sr.No. 221 ( package 7)

48

Pune Municipal Corporation

2014-2016

39

Development of 12m DP Road at Prabhag No. 9 Baner Sr.No. 227 to Vidhate wasti Sr.No. 279 and Sr.No. 244

6.08

Pune Municipal Corporation

2013-2015

40

Development of 12m DP Road in Prabhag No. 9 Baner Pashan Athashree Road and Athashree Chowk to Ramnadi and 9m Road under clause 205 along Ramnadi Riverside to Sr.No. 135 Package II

6.34

Pune Municipal Corporation

2013-2015

41

Development of 18m and 12m DP roads in Sr.No. 34 towards Sr.No. 90, 12m DP Road backside BalewadiJakatnaka and 18m dP road in Balewadi Sr.No. 33 and Sr.No. 34 Package III

11.13

Pune Municipal Corporation

2013-2015

Complete Project management including DPR preparation and supervision for the Urban Road projects until Completion

42

Development of Cocrete road in Prabhag No. 9 Hotel Sanja to Panjab Natioanal Bank Package IV

50.09

Pune Municipal Corporation

2013-2015

43

Development of Baner DP Roads in PMC Area (Total Length 6 Km 4 Lane)

38

Pune Municipal Corporation

2013-2015

44

Development of 2 Nos Bridges across River Ram (Total Bridge length 55 m each)

18

Pune Municipal Corporation

2012-2014

45

Development of 18 m DP Road from BSNL Office on Sinhagad Road uptoVadgaonBudruk along with Canal Bridge.(Bridge Length – 30m Canal Bridge + 15m Baby Canal Bridge]

7

Pune Municipal Corporation

2012-2013

46

Development of 30 m DP Road along with Canal Bridge from Ganga Bhaghyoday Building towards Vadgoan Bk on Sinhagad Road area. (Bridge Length – 30m Main Canal and 20 m on Baby canal)

14

Pune Municipal Corporation

2012-2013

47

Rehabilitation of Urban Roads with UTWT and Thin White Topping (TWT) technology in PMC area (various projects) (Total length 60 Km)

125

Pune Municipal Corporation

2011-2015

Complete Project management including DPR and supervision for Rehabilitation of urban roads using innovative UTWT above 60 Km length in Pune city

48

Storm Water Drainage Improvement for BanerBalewadi Basin of Pune under JNNURM scheme

73

Pune Municipal Corporation

2011-2014

Complete Project Management Consultancy for SWD improvement works

49

Storm Water Drainage Improvement for VadgaonBudruk Basin of Pune under JNNURM scheme

44

Pune Municipal Corporation

2011 -2013

Complete Project Management Consultancy for SWD improvement works

50

Development of Mundhwa Bypass 45 m DP Road under JNNURM project (Project Length – 4 Km)

35

Pune Municipal Corporation

2010-2012

Full DPR and supervision, project management for development of major concrete arterial Road in PMC limit

51

Third Party Inspection of Road, Building and SWD works in PMC Zonal Offices

80

Pune Municipal Corporation

2008-2009

Road Works, Building works and Storm Water drainage work of Zonal Offices in PMC area

52

Development and institution of a GIS based Pavement Management System for the Road network in the Municipal Corporation jurisdiction

NA

Pune Municipal Corporation, Pimpri.

2007-2009

Ongoing project on overall maintenance management and budget allocation for the 500 Km road network with the Municipal Corporation of Pune City, India

53

Pavement Management System Maintenance & rehabilitation of Roads in various wards of Pune Municipal Corporation Pavement Management System

55

Pune Municipal Corporation

2007-2008

Complete DPR, supervision, project management of Urban Roads in PMC limits

54

Safety Audit of Pilot BRTS works of Pune (Pune Satara Road and Pune Sholapur Road)

NA

Pune Municipal Corporation

2014

Safety Audit of the completed BRTS project.

55

Development & widening, resurfacing of NDA Road as per DP provisions for Pune Municipal Corporation

11

Pune Municipal Corporation

2009

Development of major sub arterial Road in PMC limit

56

Development & widening, resurfacing of Pashan – Sus Road as per DP provisions for Pune Municipal Corporation

10

Pune Municipal Corporation

2008

Development of major sub arterial Road (8 Km) in PMC limit

PROOF CHECKING AND SAFETY CONSULTANCY PROJECTS

Select Number Of Rows

Sr. No.

Name of Project

Project Cost (Rs. Crore)

Project Agency

Project Year

Brief description of project activities

1

White Topping alomg with Reconstryction of 20 number of culverts of two lane paved shoulders of NH 61 ( old NH 222) from Malshej Ghat (from Km 161/570 to Km 161/570- Package-I), from Ane Ghat to Ahemdnagar Bypass (from Km 161/570 to Km 211/000- Package-II) & From Kharwandi Kasar to Junction of NH 211 (from Km 284/000 to Km 337/000- Package-III) of 163Km in the State of Maharashtra on EPC mode.

254.57

National Highways Authority of India -     T & T Infra Pvt. Ltd.

2024-Ongoing

Proof Checking of the drawings & Design

2

Construction of Cement Concrete Roads and Drains of D.P.Roads under Maharshtra Suvarna Jayanti Nagarotthan Mahabhiyan Yogana in Municipal Council, Omerga Area Tq. Omerga, District Osmanabad (16 Roads), in the state of Maharashtra.

99.8

PWD, Maharashtra - Vikram Infratech Developers Pvt. Ltd

2024-Ongoing

Proof Checking of the drawings & Design

3

CONSULTANCY SERVICES FOR WIDENING TWO LANE WITH PAVED SHOULDER FROM KM 0.00 TO 24.00 OF NH-166E THE STATE OF KARNATAKA.(TIKOTA BIJJARGI KANAMADI MH BORDER SECTION)

158.45

NH (PWD) Vijapur Division Karnataka -J.M.Mhatre Infra Pvt.Ltd

2024-Ongoing

Proof Checking of the drawings & Design

4

FOR Rehabilitation and Upgradation of Jamkhed To Sautada Section of NH 548D from design Ch: Km 195.375 to Ch: Km 208.774 to two lane with paved shoulder/Four Lane configuration with rigid Pavement in the state of Maharashtra on EPC mode

133.27

PWD, Maharashtra-Dhaneshwar Construction Private Limited 

2024-Ongoing

Proof Checking of the drawings & Design

5

A ) For Improvement to Karanja - Bharsingi - Mowad Bangaon Road ( SH 323 ) in Km 60/00 to 67/400 (Part Km 62/100 to 67/380) Tal Narkhed Dist Nagpur Maharashtra on Engineering, Procurement & Construction (EPC) Mode

97.6

PWD, Maharashtra-Abhi Engineering Corporation Private Limited

2024-Ongoing

Proof Checking of the drawings & Design

6

Design and Construction using Thin White Topping (TWT) including routine maintenance & balance works from KM. 42.000 to KM.179.946 (Total Length 137.946 KM) in the state of Maharashtra as standal one project on EPC Mode

105.5

NHAI - Shankar Ramchandra Earthmovers Pvt Ltd

2024-Ongoing

Proof Checking of the drawings & Design

7

 “Construction of New bypass cement concrete road of two lane with earthen shoulders purna road to malegaon road to hingoli road SH-247 (Nanded city Northern Bypass) km 0/000 to 6/000 Tq. Nanded Dist. Nanded (Actual Chainage 9/000 to 16/100).”

78.59

PWD, Maharashtra-SHARDA Construction & Corporation Pvt. Ltd

2024-Ongoing

Proof Checking of the drawings & Design

8

“Construction of Cement Concrete Road with Land Acquisition from NH-752 I to Chondi Kurunda Malegaon Taroda Bk Road SH-435 From Km 23/600 to Km 37/800, Tq. Nanded Dist Nanded. (Taroda Malegaon Project)”

106.78

PWD, Maharashtra-SHARDA Construction & Corporation Pvt. Ltd

2024-Ongoing

Proof Checking of the drawings & Design

9

EPC-21 Improvement of Kalyan Nagar Pathirdi Parbhani Nanded Bhokar Malsha Nirmal Road NH 61 km 592/00 to 615/00 (Total Length 22.03km) (Part-Bhokar-Rahati to State Border),Bhokar,District Nanded,Maharashtra on EPC mode.

90

NH PWD Maharashtra MoRTH Project

2022-23

Proof Checking of the drawings & Design

10

Providing Two laned Paved shoulder in Km 311/800 to Km 340/00 (Aurangabad- Nagar Naka-Ellora) of NH-211 in the State of Maharashtra on EPC mode. (Total length 29 Km)

90

NH PWD Maharashtra MoRTH Project

2015

Proof Consultant for project appointed by NH PWD Maharashtra

11

DEVELOPMENT AND OPERATION OF AHMEDNAGAR-PATHARDI SECTION OF NH-222 (FROM KM 232+000 TO KM 284+000) IN THE STATE OF MAHARASHTRA (Total length 52 Km)

180

NH PWD Maharashtra MoRTH Project

2015

Proof Consultant for project appointed by NH PWD Maharashtra

12

White Topping alomg with Reconstryction of 20 number of culverts of two lane paved shoulders of NH 61 ( old NH 222) from Malshej Ghat (from Km 161/570 to Km 161/570- Package-I), from Ane Ghat to Ahemdnagar Bypass (from Km 161/570 to Km 211/000- Package-II) & From Kharwandi Kasar to Junction of NH 211 (from Km 284/000 to Km 337/000- Package-III) of 163Km in the State of Maharashtra on EPC mode.

254.57

National Highways Authority of India -     T & T Infra Pvt. Ltd.

2024-Ongoing

Safety Audits at Design, Implementation and Completion Stages for the Project as Safety Consultant

13

Construction of Cement Concrete Roads and Drains of D.P.Roads under Maharshtra Suvarna Jayanti Nagarotthan Mahabhiyan Yogana in Municipal Council, Omerga Area Tq. Omerga, District Osmanabad (16 Roads), in the state of Maharashtra.

99.8

PWD, Maharashtra - Vikram Infratech Developers Pvt. Ltd

2024-Ongoing

Proof Checking of the drawings & Design

14

CONSULTANCY SERVICES FOR WIDENING TWO LANE WITH PAVED SHOULDER FROM KM 0.00 TO 24.00 OF NH-166E THE STATE OF KARNATAKA.(TIKOTA BIJJARGI KANAMADI MH BORDER SECTION)

158.45

NH (PWD) Vijapur Division Karnataka -J.M.Mhatre Infra Pvt.Ltd

2024-Ongoing

Safety Audits at Design, Implementation and Completion Stages for the Project as Safety Consultant

15

FOR Rehabilitation and Upgradation of Jamkhed To Sautada Section of NH 548D from design Ch: Km 195.375 to Ch: Km 208.774 to two lane with paved shoulder/Four Lane configuration with rigid Pavement in the state of Maharashtra on EPC mode

133.27

PWD, Maharashtra-Dhaneshwar Construction Private Limited 

2024-Ongoing

16

A ) For Improvement to Karanja - Bharsingi - Mowad Bangaon Road ( SH 323 ) in Km 60/00 to 67/400 (Part Km 62/100 to 67/380) Tal Narkhed Dist Nagpur Maharashtra on Engineering, Procurement & Construction (EPC) Mode.

97.6

PWD, Maharashtra-Abhi Engineering Corporation Private Limited

2024-Ongoing

17

“Construction of Cement Concrete Road with Land Acquisition from NH-752 I to Chondi Kurunda Malegaon Taroda Bk Road SH-435 From Km 23/600 to Km 37/800, Tq. Nanded Dist Nanded. (Taroda Malegaon Project)”

106.78

PWD, Maharashtra-SHARDA Construction & Corporation Pvt. Ltd

2024-Ongoing

18

“Construction of High-level Bridge across Asna River on Malegaon to Taroda Naka Road MDR-93 Near Pasadgaon village, at Km 10/00 Tq. & dist. Nanded (With Land Acquisition) [FORM – C].”

23.32

PWD, Maharashtra-SHARDA Construction & Corporation Pvt. Ltd

2024-2024

19

Up-Gradation /Reconstruction to two lanes with Paved Shoulder (Package No. Nashik- Iv)-Nhavara-Inamgaon-Kashti-shrigonda Adhalgaon-Jalgaon-Jamkhed of SH-55 (New- NH-548D) Section II; Adhalgaon (Km 132+600) to Jamkhed (Km195+375).Length- 62.775 km,In the state of Maharashtra on EPC Mode.

350

NH PWD Maharashtra MoRTH Project

2022-23

20

Construction of CC Road and RCC Drain for the folloeing Road Section : 1. Juna Mondha-Godavari River Bridge- Dr.Ambedkar chowk Road SH-256 Part Km 72/200 to 75/700 Package154/1Length=3.000Km and 2. Nanded Latur Road –Bhagat singh Chowk-Godavari River New Bridge (West Bypass Road) SH-247 Part Km 0/000 to 4/600 ,Package 154/2,Length =2.380 km

93.32

PWD Maharashtra MoRTH Project

2021-22

21

Improvement /Widening to two Lane of Gadchandur-Patan-Wani Road (SH-373) Total Length 53 KM (2nd call) UNDER Hybrid Annuity Package No.NAG.142

108

PWD Maharashtra MoRTH Project

2021-22

Safety Audits at Design, Implementation and Completion Stages for the Project as Safety Consultant

22

Improvement /Widening to two Lane of Bhoyegaon-Gadchandur-Jiwati Road (SH-373) Total Length 21 KM (2nd call) UNDER Hybrid Annuity Package No.NAG.142

106

PWD Maharashtra MoRTH Project

2021-22

23

Two Laning Paved Shoulder for NH-218 from Design Ch.4.400 to 56.000 (Bijapur Hubli Section Package I) in the State of Karnataka – (Total length 51.4 Km)

190

NH PWD Karnataka MoRTH Project

2017-2018

Safety Consultants for the project appointed by NH PWD Karnataka

24

REHABILITATION & STRENTHENING OF NH- 222 for Two Lane with Paved Shoulder under NHDP IV Km 101/00 to 161/570 IN STATE OF MAHARASHTRA. – (Total length 60 Km)

230

NH PWD Maharashtra MoRTH Project

2016-2017

Safety Audits at Design, Implementation and Completion Stages for the Project as Safety Consultant


PROJECTS: (USA)

Super Pave Validation study:

Worked on material characterization, data analysis and final report preparation of this study, aimed at identifying suitable validation projects within the Commonwealth of Pennsylvania and to characterize asphalt binders and mixtures for Super Pave, a new and advanced procedure for selecting and designing asphalt paving mixtures in the US.

Database for Performance-Graded binders for North East Asphalt User Producer Group (NEAUPG):

Worked on development of the new NECEPT Database, used for the compilation of the QC/QA test results by State DOTs and asphalt binder suppliers. The database has been proven to be a very systematic and user friendly tool for handling and analyzing the binder test data for research objectives.

Performance-Graded Binder Specifications:

Devised a new statistical procedure for acceptance and payment for PG binders based upon the within laboratory and between laboratory testing variability. Developed a new dispute resolution scheme to balance the risk between the asphalt binder supplier, hot mix contractor and the state agency that will form part of the Quality Assurance and acceptance plan of State DOTs.

Binder and Field Technician Training Workshops:

Worked in close association with NECEPT personnel for coordination of training workshops in the area of Hot Mix Asphalt Concrete construction.

Super Pave In situ Stress Strain Investigation (SISSI):

Worked for the Super pave In-Situ Stress/Strain Investigation a significant Penn Dot project for calibration and validation of performance prediction models of the AASHTO 2003 Pavement Design Guide. Work included instrumentation of pavements, material sampling, construction operation monitoring, laboratory testing, material characterization, static and dynamic data acquisition and analysis.